Virtual preconstruction for data-driven decisions

Do you know where your project stands today?

Not last month. Today. We build your project virtually first and keep its baseline alive against real site progress, so you decide while the overrun can still be avoided.

Talk to a consultant
Looping video · real site and platform
The problem

What you don't see in time, you don't get back.

Cost overruns come from two places, and both are found too late.

01

Baselines built once, never validated.

Schedule and budget are set at the start, on assumptions, and nobody checks them against the real project again.

02

Execution no one sees in time.

Design, procurement and the site work with different numbers. The first deviation catches the team with no common ground to react.

03

One report a month, built by hand.

The real status arrives weeks later, pieced together between emergencies. By the time it shows, the overrun could no longer be avoided.

Final project deviation

The difference between finding out in time and finding out too late.

Traditional constructionFixed baseline, monthly report
10 to 40 %
With virtual preconstructionValidated baseline and data-driven tracking
5 to 10 %

Ranges of final cost and schedule deviation. The second row depends on three conditions working together: virtual preconstruction, running the project on a platform like ours, and a team that decides with data.

How we work

One data flow, from the first line of the model to the last week on site.

Each phase delivers what the next one needs. That is why we don't sell standalone services.

01
Unlocks the metadata

Digital asset and coordination

We model, split and code the project so every element is ready to simulate and to cost.

02
Integrates time and cost

Virtual preconstruction

We simulate the construction sequence and estimate cost from the digital asset. The integrated cash flow comes out of it.

03
Measures every week

Virtual site tracking

The platform calculates the week's metrics on its own, and our AI agents show you where the project is heading.

ADOTUS platform

Every week, the project measures itself.

The platform calculates the week's metrics against the baseline and delivers them to each role. Control discipline no longer depends on someone putting a report together.

  • 01
    Baseline vs. actual progress

    What is behind shows without interpreting a report.

  • 02
    Lookahead with constraints

    What is not released gets flagged before it stops the site.

  • 03
    AXIA and VITRU agents

    Plain-language questions, on the web and on WhatsApp.

Automatic weekly reportWeek 32 · Monday 7:00
Actual vs. planned progressWatch
Weekly plan completionOn track
Cost incurred vs. budgetOn track
Open constraints in the lookaheadCritical
Sent to: management · site management · cost control

Illustration. Metrics to be confirmed with the platform walkthrough.

Track record

Experience is proven with projects.

See projects →
18+years
managing construction projects
300,000+m²
in virtual preconstruction
100,000+m²
with data-driven site tracking
3countries
Colombia, United States and Mexico

They decided with our data

Cusezar
Ingeurbe
Quantum
Baus
Fores
Modernitive
Next step

Do you know where your project stands today?

A fifteen-minute conversation with a consultant is enough to review how your next project's baseline is built and where your team is finding out too late. You leave with a read on your case, not a sales pitch.

Material pending
Message us